14:405G · 82%
SurgePVMS
Parekh Textiles, Narol GIDC · Design 2

Smart Fill applied

By Priya Nair · 25 Oct, 14:32 · version 7
Neighbour mill, 5 floors
Flat RCC roof, 84 × 50 m = 4,200 m²
Lift room
Water tanks
Face A
Face B
Face C
Face D
Face E
↑N
10 m
498.8 kWp
was 611.9 kWp
783.6 MWh
Energy, year 1
1,571
kWh/kWp, was 1,548
1.13
DC:AC · 4 × SG110CX
Why these faces
  1. 1
    Faces A and B kept in full, highest irradiation.
  2. 2
    Face E removed: shaded by the neighbouring mill after 14:00.
  3. 3
    Face D cut to 1 row: lift room shade in winter.
Editing happens in Studio on a laptop. From here you can approve or comment.
Demo data