Commercial1.2 MW2800 Industrial Blvd, West Sacramento, CA 95691·Owner: Marcus Lee
Estimated from SurgePV's warehouse profile. Demand charges are set by the highest 15-minute kW each month, and an estimated profile can miss it. Upload 15-min interval data →
Demand charges before solar$148,755 /yr
Demand charges after solar$137,325 /yr
Demand savings$11,430 /yrshown separately on the proposal
Energy savings$311,240 /yryear-1 bill savings $322,670

Highest kW each month

0200400600JFMAMJJASOND
Before solarAfter solarkW, highest 15-min each month
Solar cuts the midday peaks. The summer peak period (16:00 to 21:00) is mostly after solar output falls, so peak-period demand drops only 7% (1,847 to 1,719 kW-months). A battery is the lever for that charge.
MonthMax kW
before

after
Peak kW
before

after
Demand $
before

after

saved
Jan440418––$8,668$8,235$433
Feb436409––$8,589$8,057$532
Mar448412––$8,826$8,116$709
Apr462421––$9,101$8,294$808
May478433––$9,417$8,530$886
Jun492446452421$18,958$17,417$1,542
Jul498452461429$19,261$17,699$1,562
Aug505458466433$19,502$17,899$1,602
Sep512461468436$19,680$18,020$1,661
Oct470431––$9,259$8,491$768
Nov446420––$8,786$8,274$512
Dec442421––$8,707$8,294$414
Year5,6295,1821,8471,719$148,755$137,325$11,430
Max demand $19.70/kW every month. Peak-period demand $20.50/kW, June to September. Example rate values.