SurgePV Shivalik EnergyAS

Welcome to SurgePV, Shivalik Energy

Sun 1 Nov, day 7. Your first 5 projects are here. 5 more are due by 8 Nov. Your Arka plan ends 11 Nov; SurgePV is free until 11 Jan 2027.

5projects moved from Arka
5in progress, due 8 Nov
4not covered (decide later)
0new projects yet

Moved from Arka

All projects
ProjectkWpApproved
Negi Residence, Sahastradhara Rd5.2227 OctOpen
Himgiri Cold Store, Selaqui120.0628 OctOpen
Pinecrest Public School hostel48.1430 OctOpen
Bisht Residence, Rajpur Rd6.3831 OctOpen
Aarogya Clinic, Haridwar Rd85.261 NovOpen

Proposal template installed

Arka-look
Default for new proposals. Same section order as your Arka PDF. Logo and colours from your sample.
Edit template

Structure library

  • Fixed tilt · elevated 1.2 m (Arka style)Default
  • Fixed tilt · elevated 2.4 m (Arka style)Editable
  • Fixed tilt · ground (Arka style)Editable
  • Tin shed · railEditable

What's different from Arka

1 of 6
  • Open a moved project and orbit it in 3D. Done
  • Structures are set per subarray, not per project.
  • Stringing lives in the electrical step after layout.
  • Tariffs: pick your DISCOM from the list or enter a flat rate.
  • Proposals: Arka-look is the default; other templates are one click away.
  • Invite your second designer seat.
Watch the 6-minute walkthrough
Demo data