Switch from Arka · Needs your attention
2 projects can't be redrawn as they are
Thu 29 Oct. Nothing is lost and no redraw credit is used. Each one needs a different next step.
Kandari Residence, Prem Nagar
Can't read fileTicket RD-0151 · priority 10 · uploaded 25 Oct
Kandari_Residence_export.csv has no roof outline and no panel positions, so a designer can't rebuild the layout from it.
project_id,module_sku,qty,inv_sku,tilt
77198,WS-580-M10,9,GW5K-DT,10
… 3 rows, no geometry
What works instead
- The proposal PDF. In Arka: open the project, go to Proposal, Download PDF.
- Or the project share link, if the project still opens in Arka.
- Or a screenshot of the layout plus the module count.
Your credit is held until 5 Nov. If a readable file arrives by then, the project goes back in the queue and keeps its 8 Nov date.
SIDCUL Haridwar ground mount
Over 5 MWPriority 14 · 5,800.00 kWp · 10,000 × 580 Wp · PDF 22 pages
Redraws cover rooftop and ground projects up to 5 MW. This site is 5.8 MWp.
Why it is handled separately
- A site this size needs a full layout: roads, inverter stations, cable routes and boundary setbacks, not just panel rows.
- That takes a designer several days, not a few hours.
What happens next
- We send it to Heaven Green Energy design services (Solar Desk).
- You get a written quote and a date within 2 working days.
- You decide. If you say no, the PDF stays attached to the customer as an archive.
Routed 29 Oct, 11:02. Status: waiting for quote.