Bill agent pilot · Grading inbox
Grading inbox
Every agent run lands here before anyone outside HGE sees it. A designer checks each field the agent read from the bill and says whether the proposal could go to the customer. Pilot week 6 · Fri 4 Dec 2026.
176Bills graded since 26 Oct
7Awaiting grade (oldest 22 h)
16 minMedian time saved per "Yes" run
6Agent stops in the last 14 days
Fields 1–9: pass designer corrected not graded
| Run | Customer · bill family · received | Status | Fields | Score | Send? | Saved |
|---|---|---|---|---|---|---|
| RUN-0419 | Mehta Residence, Gandhinagar UGVCL RGP · 4 Dec 10:51 |
Reading tariff, step 3 of 6 | – | – | – | |
| RUN-0418 | Desai Residence, Bopal Torrent LT-RES · 4 Dec 10:46 |
Awaiting grade | – | – | – | |
| RUN-0417 | Kapoor Residence, Andheri E Adani LT-RES · 4 Dec 09:58 |
Awaiting grade | – | – | – | |
| RUN-0416 | Kulkarni Residence, Kothrud MSEDCL LT-I (TOD) · 4 Dec 09:31 |
Stopped: sanity check | 7/9 | No | 0 min | |
| RUN-0415 | Joshi Residence, Thaltej Torrent LT-RES · 3 Dec 18:20 |
Graded | 9/9 | Yes | 17 min | |
| RUN-0414 | Chaudhary Residence, Mehsana UGVCL RGP · 3 Dec 17:05 |
Graded | 6/9 | No | 0 min | |
| RUN-0413 | Pawar Residence, Nashik MSEDCL LT-I · 3 Dec 15:40 |
Graded | 5/9 | No | 0 min | |
| RUN-0412 | Bhatt Residence, Vastrapur Torrent LT-RES · 3 Dec 12:12 |
Graded | 8/9 | Yes | 15 min |
RUN-0414 · Chaudhary Residence
GradedUGVCL RGP · graded by Abhishek Patel, 3 Dec 17:31 · 18 min
| Field | Agent read | Designer | |
|---|---|---|---|
| Consumer no. | 21408 77315 | same | ✓ |
| Name on bill | H. Chaudhary | same | ✓ |
| Address | Mehsana 384002 | same | ✓ |
| Tariff category | UGVCL RGP | same | ✓ |
| Sanctioned load | 4 kW | 4.5 kW | ✗ |
| Billing period | Aug 2026 | Jul–Aug 2026 | ✗ |
| Units / month | 486 kWh | 243 kWh | ✗ |
| Bill amount | ₹3,920 | same | ✓ |
| Fixed charges | ₹45 | same | ✓ |
Would send to customer: No
Reason: system size wrong. The bill covers two months; the agent sized 3.9 kWp for 486 kWh a month. Real use is 243 kWh a month, about 2 kWp.
UGVCL bills cover two months. 9 of the last 50 UGVCL runs read them as one month.