SurgePV Internal pilot · agent output is not sent to customers Heaven Green Energy JR
Bill agent pilot · Agent stops · RUN-0416

RUN-0416 · Kulkarni Residence, Kothrud

MSEDCL LT-I residential, TOD meter · bill ₹5,120, 410 kWh · received 4 Dec 09:31 · stopped at step 5 of 6 (financials), 09:35

The agent stopped: the financial result failed 2 sanity checks. No proposal PDF was made and nothing was sent to the customer. This page is for graders only. The bill fields were read and still count toward MSEDCL field accuracy. "Would send" is recorded as No, reason "agent stopped".

Sanity checks on the financial result

#CheckThis runResult
1Bill units vs annual estimate, within ±40%410 kWh vs 6,600 kWh/yrPass
2System size at most 1.2 × annual use ÷ yield5.5 kWp ≤ 1.2 × 4.6 kWpPass
3Yield between 1,300 and 1,650 kWh/kWp1,440 kWh/kWpPass
4No generation between 19:00 and 06:003,630 of 7,920 kWh/yr (46%) at nightFail
5Monthly saving is not more than the monthly billSaving ₹5,480 > bill ₹5,120Fail
6Payback between 2 and 15 years2.9 years, depends on 4Skipped
7Subsidy matches size (PM Surya Ghar)₹78,000Pass

Other stops in the last 14 days

RunDateFamilyWhat failedIssue
RUN-04091 DecTorrent LT-RESPayback shown as 0.0 years; system never pays backISS-122
RUN-040229 NovUGVCL RGPFully subsidised system evaluated as no incentivesISS-123
RUN-039627 NovTorrent LT-RESLoan EMI in summary 12× the table valueISS-72 B

Hourly generation, a clear day in March

kWh per hour for the 5.5 kWp system. Shaded hours are 19:00 to 06:00.

1
2
3
4
036912151821
Expected from the sun path (21.7 kWh/day)What the agent used (0.9 kWh every hour)
On the TOD tariff path the engine spreads monthly generation evenly over all 24 hours (ISS-125). The night share offsets peak-rate night units, so the saving comes out higher than the bill. Check 5 caught it.

After go-live, the customer would get the WA04-style fallback ("a designer will call you") instead of a proposal.

Demo data